50007 “Hercules “is looking a little faded this week as work begins on the repaint at Arlington Fleet Services,Eastleigh.
As you can see the body sides have been rubbed down extensively with a couple of small body sides repairs carried out onsite.

50049 “Defiance” will be entering the paint shed next week.
The work on both locomotives is expected to last 6 weeks.

Photo by G Woodman with permission